Elizabeth Train Station
Elizabeth Train Station Project used a total of (46) helical piles. These piles have allowable capacities of up to 77 kips were used. The project was taken on to support new platforms. Piles were installed through an upper fill layer and down to a dense sand layer. Lengths ranged between 18 ft and 39 ft with center of pile as close as 6 ft to the edge of the railroad track. The Piles were cast into 30” diameter concrete columns. This was done in order to meet project lateral deflection criteria.
Additional information
Products Used | MH434U, MH434U-6 |
---|
Description
Elizabeth Train Station Project used a total of (46) helical piles. These piles have allowable capacities of up to 77 kips were used. The project was taken on to support new platforms. Piles were installed through an upper fill layer and down to a dense sand layer. Lengths ranged between 18 ft and 39 ft with center of pile as close as 6 ft to the edge of the railroad track. The Piles were cast into 30” diameter concrete columns. This was done in order to meet project lateral deflection criteria.